Hunter Power Project
Cybuild streamlined commissioning and completion processes for Snowy Hydro's 660MW gas-fired power station at Kurri Kurri, NSW.
The figures
- 80,000+
- Inspection Test Records
- 350+
- subsystems turned over
- 2+ years
- PROJECT-WIDE ADOPTION Entire workforce and management
- $Millions+
- PRODUCTIVITY SAVINGS on a $1.3B project

What Cybuild did on the Hunter Power Project
- More than 80,000 Inspection Test Records (ITRs) were completed in Cybuild.
- More than 350 subsystems were turned over.
- The entire workforce and management used Cybuild across the project for more than two years.
- Productivity savings ran into the millions of dollars on a $1.3B project.
The module behind it
These figures come from Cybuild Completions. See the other case studies.