Glossary
The terms construction and commissioning teams use, each defined in a sentence or two. Where Cybuild has a feature for a term, the entry says what it does.
- Asset register
The list of a project's assets of one kind, with the attributes each asset is built and tested against.
Cybuild Completions holds multi-discipline registers for assets, cables, circuits, I/O signals, piping lines, pipe spools, flanges, welds, valves and instrumentation. Cybuild Completions
- Completions management
Tracking that every asset and system on a project has been built, inspected and tested, and its records gathered, from construction through commissioning to operations.
Cybuild is designed for seamless completions tracking from construction through to commissioning and operations. Cybuild Completions
- Handover (Turnover)
The formal transfer of a system or subsystem from one phase of a project to the next, with its records: from construction to commissioning, and from commissioning to operations.
The Handover submodule ties the project's data sources together and works as the gates between construction, commissioning and operations. Cybuild Completions
- Inspection and Test Plan (ITP)
The plan for a scope of work that lists each inspection and test it requires, what it is checked against and who must sign it off. The records of those inspections are ITRs.
- Inspection Test Record (ITR)
The checklist completed to record an inspection or test of an asset.
Cybuild's ITRs are digital checklists with form fields, reference diagrams, tables and photos; data entered in an ITR updates the asset registers in real time. Cybuild Completions
- Management of Change (MoC)
The controlled process for proposing, approving and recording a change to a project's design or scope.
Cybuild Completions tracks management of change natively. Cybuild Completions
- Mechanical completion
The milestone at which a system's construction is finished and its inspections are complete, so that it can be handed over for commissioning.
- Permit to Work (PTW)
A formal authorisation to carry out a defined piece of hazardous work, in a stated place and for a stated time, under stated controls.
Cybuild's permits are applied for remotely and sent to the approvers the applicant selects, through an all-digital approval flow. Each permit records its holder, discipline, work location and scope, SWMS, asset, required and expiry dates, duration and number of workers. Cybuild Permit to Work
- Punch list
The list of defects and outstanding items found on a system, each tracked until it is rectified and closed.
Defect management is a core function of Cybuild Completions, with flows that cover rectification, recategorisation and approval. Cybuild Completions
- Redline
A mark-up on a drawing that records how the work was actually built or should change.
With the Drawings add-on, teams complete and submit redlines from the field, through a digital redline approval flow. Drawings add-on
- Relinquishment
Handing a permit back when its work has stopped or finished, so that the permit can be closed.
Permit holders relinquish permits from the field in the Cybuild mobile app. Cybuild Permit to Work
- Revalidation
Confirming that a permit's conditions still hold, so that its work can continue for a further period.
Permit holders request revalidation from the field in the Cybuild mobile app, with every permit's expiry date and duration tracked. Cybuild Permit to Work
- Safe Work Method Statement (SWMS)
A document that sets out a piece of high-risk work, its hazards and the controls for them.
Each Cybuild permit records its SWMS. Cybuild Permit to Work
- Work pack
The set of documents a crew needs to carry out a piece of work.
With Cybuild's digital work packs, everything work crews need is easily accessible. Cybuild Completions